Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the nfd_wpnavbar_setting handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home4/parimalc/public_html/wp-includes/functions.php on line 6078

Deprecated: strpos(): Passing null to parameter #1 ($haystack) of type string is deprecated in /home4/parimalc/public_html/wp-includes/functions.php on line 7288

Deprecated: str_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home4/parimalc/public_html/wp-includes/functions.php on line 2187
Meter Testing - Parimal Clean Energy Systems Pvt Ltd

Contribution in error by each and every component of distribution system plays equal role. Along with faulty meters and improper secondary wiring, all the components of a metering system also contribute towards errors if not checked at proper intervals.

A metering unit mainly comprises of CTs, PTs, Meter and Secondary wiring. Due to unavailability of suitable & reliable methods or instruments for site testing, these components are not tested or rarely tested and used to see as sources of potential errors. Errors caused due to CTs & PTs lead to large losses to utilities and hence has become the major focus area to reduce losses. Testing Services is divided in two parts-

  • CT/PT & HT Meter Testing
  • Consumer Meter Testing

Our site testing covers the testing of single phase to three phase direct connected meters, LTCT operated meter along with LT Current Transformer and HT trivector meter up to class 0.2s along with potential and current transformer.